(A)期刊論文(Journal Papers)
  1. D Y Sha, Sheng-Yuan Hsu, Hong-Yi Chen, 2016, “Creative Problem-solving QC Story based on Systematic Innovation TRIZ”, Journal of Quality, Vols. 23, No 1, pp. 25-41. (EI)
  2. D.Y.Sha, G.R.Liang, Kun-Chih Huang, 2013, “An Empirical Study on the Influencing Factors of Design Chain Integration”, Journal of Applied Sciences,13(10), pp. 1805-1810. (EI)
  3. D. Y. Sha, Der-Baau Perng, Guo-Liang Lai, 2013, “A Study of Using Smart Digital Content Technology in Retail Stores”, Applied Mechanics and Materials, Vols. 411-414, pp. 2161-2166.(EI)
  4. D. Y. Sha, Kun-Chih Huang, P.K.Chen, 2013, “The Influencing Factors of Customer Chain Integration - An Empirical Study”, Advances in Information Sciences and Service Sciences, Vol. 5, No. 4, pp. 371-378.(SCOPUS)
  5. D. Y. Sha, Guo-Hiang Lai, 2013.1, “Building an Innovative Digital Content Information System to Improve Service Quality of Retail Stores”, International Journal of Advancements in Computing Technology, Vol. 5, No. 2, pp. 819 ~ 827. (EI)
  6. D. Y. Sha, Guo-Liang Lai, 2012.12, "Exploring the Intention to Use Innovative Digital Content Information Technology", Proceedings of the 2012 IEEE International Conference on Industrial Engineering and Engineering Management(IEEM 2012), pp. 1065 ~ 1069. (EI)
  7. D. Y. Sha, Kun-Chih Huang, P. K. Chen, 2012.3, "A Study on the Key Factors of Customer Chain Effectiveness", Lecture Notes in Engineering and Computer Science, v2, pp.1259-1262, International MultiConference of Engineers and Computer Scientists IMECS 2012. (EI)
  8. D. Y. Sha, Hsing-Hung Lin, 2011, “A New Particle Swarm Optimization for Multi-objective Open Shop Scheduling”, Journal of Information & Optimization Sciences, 32(6), 1269-1287. (EI)A New Particle Swarm Optimization for Multi-objective Open Shop Scheduling
  9. D. Y. Sha, Hsing-Hung Lin, 2010, “A multi-objective PSO for job-shop scheduling problems”, Expert System With Applications, Vol. 37, No. 2, pp. 1065-1070. (SCI, 2008 Impact Factor: 2.596) A multi-objective PSO for job-shop scheduling problems
  10. D. Y. Sha, C. J. Yang, 2009, “The transport strategies for fully-automated manufacturing in 300 mm water fab”, International Journal of Computer Integrated Manufacturing, Vol. 22, No. 10, pp. 962-975. (SCI)
  11. S. Y. Hsu, D. Y. Sha, Y. H. Chang, 2009, “An Integrated Dispatching Rule with On-Line Rework Consideration in Wafer Fabrication”, Journal of Manufacturing Technology Management, Vol. 20, No. 8, pp. 1166-1182. (EI)
  12. D. Y. Sha, Hsing-Hung Lin, 2009, “A particle swarm optimization for multi-objective flow-shop scheduling”, International Journal of Advanced Manufacturing Technology,Vol. 45, No. 7, pp. 749-762. (SCI)A particle swarm optimization for multi-objective flow-shop scheduling
  13. D. Y. Sha, P. K. Chen, Y. H. Chen, 2008, “Exploring the effects of advanced manufacturing technology and e-commerce in the alignment of supply coordination and competitiveness performance”, Journal of the Chinese Institute of Industrial Engineers, Vol. 25, No. 5, pp. 399-412. (EI, TSSCI)Exploring the effects of advanced manufacturing technology and e-commerce in the alignment of supply coordination and competitiveness performance
  14. D. Y. Sha, P. K. Chen, 2008, “Measuring the performance of different supply-chain integration strategies”, Journal of Statistics and Management Systems, Vol. 11, No. 4, pp. 721-748. (EI)Measuring the performance of different supply-chain integration strategies
  15. D. Y. Sha, P. K. Chen, 2008, “The best scope of e-commerce diffusion in a supply-chain operational environment: A global empirical study”, Journal of Information and Optimization sciences, Vol. 29, No. 4, pp. 705-730. (EI)The best scope of e-commerce diffusion in a supply-chain operational environment: A global empirical study
  16. D. Y. Sha, P. K. Chen, Y. H. Chen, 2008, “The strategic fit of supply chain integration in the TFT-LCD industry”, Supply Chain Management: An International Journal, Vol. 13, No. 5, pp. 339-342. (SSCI)The strategic fit of supply chain integration in the TFT-LCD industry
  17. D. Y. Sha, C.-Y. Hsu, 2008, “A new particle swarm optimization for the open shop scheduling problem,” Computers & Operations Research Vol. 35, pp.3243-3261. (SCI).
  18. D. Y. Sha, J. T. Lin, C. J. Yang, 2008, “The evaluation of search range assignment in 300mm automated material handling system (AMHS),”International Journal of Advanced Manufacturing Technology, Vol. 35, pp.697-710.(SCI).
  19. D. Y. Sha, H. S. Wang, Z. H. Che, B. S. Teng , 2007, “Constructing R&D Alliances in Product Development through System Engineering,” International Journal of Electronic Business Management Vol. 5(1), pp. 59-69 (EI).
  20. D. Y. Sha, P. K. Chen, Yung-Hsin Chen, 2007.12, "Alignment strategies of AMT and e-commerce setting to improve business strategy in the supply chain operations environment-An empirical study", Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 1487-1491(Session Chair)  (EI)
  21. Z. H. Che, H. S. Wang, D. Y. Sha, 2007, “A multi-criterion interaction-oriented model with proportional rule for designing supply chain networks,” Expert Systems with Applications, Vol. 33, Issue 4, pp. 1042-1053 (SCI).
  22. D. Y. Sha, S. Y. Hsu, X. D. Lai, 2007.12, “Design of Due-Date Oriented Look-Ahead Batching Rule in Wafer Fabrication”, International Journal of Advanced Manufacturing Technology,Vol.35, No. 5-6, pp.596-609 (SCI).
  23. S. Y. Hsu, D. Y. Sha, 2007, “The Integration of Shop Floor Control in Wafer Fabrication,” Journal of Manufacturing Technology Management, Vol. 18, Issue 5, pp. 598-619 (EI).
  24. D. Y. Sha, Richard  Lee Storch, Cheng-Hsiang Liu, 2007, “Development of a Regression-based Method with Case-based Tuning to Solve the Due Date Assignment Problem”, International Journal of Production Research, Vol. 45, No. 1, pp. 65-82 (SCI).
  25. Chao-Ton Su, Yung-Hsin Chen, D. Y. Sha, 2007, “Managing Product and Customer Knowledge in Innovative New Product Development”, International Journal of Technology Management, Vol. 39, Nos. 1/2, pp. 105-130 (SCI, SSCI).
  26. D. Y. Sha, C.-Y. Hsu, 2006, “A Hybrid Particle Swarm Optimization for Job Shop Scheduling Problem,” Computers & Industrial Engineering, Vol. 51, No. 4, pp. 791-808 (SCI).
  27. Chi-Chang Liu, Yung-Hsin Chen and D.Y.Sha, 2006.11, “The TRIZ Application in the Development of an Automotive Telematics Platform,” The TRIZ Journal (on-line publication).
  28. D. Y.Sha, Ping-Kuo Chen, Yung-Hsin Chen, 2006, “Exploration of the Gap Problem between Planning  and Execution in the Supply Chain–A Case of Taiwan IC Industry,” Asian Journal of Management and Humanity Sciences ,Vol. 1, No.2. ,pp. 194-207
  29. D. Y. Sha, Cheng-Hsiang Liu, 2006, “Development and Evaluation of a Tree-Indexing Approach to Improve Case-Based Reasoning: Illustrated Using the Due Date Assignment Problem”, International Journal of Production Research, Vol. 44. No. 15, pp 3033-3049 (SCI).
  30. D. Y. Sha, S. Y. Hsu, Z. H. Che, C. H. Chen, 2006, “A Dispatching Rule for Photolithograpy Scheduling with An On-line Rework Strategy”, Computers & Industrial Engineering, Vol. 50, pp. 233-247 (SCI).
  31. Chao-Ton Su, Yung-Hsin Chen, D. Y. Sha, 2006, “Linking Innovative Product Development with Customer Knowledge: a Data-Mining Approach”, Technovation, Vol. 26, No. 7, pp. 784-795 (SSCI, SCI, EI).
  32. D. Y. Sha, Z. H. Che, 2006, “Supply Chain Network Design: Partner Selection and Production/ Distribution Planning Using a Systematic Model”, Journal of the Operational Research Society, Vol. 57, No. 1, pp. 52-62 (SSCI, SCI).
  33. Yung-Hsin Chen, D. Y. Sha, Chien-Hui Yang, 2005, “Attractive Quality Creation via the Kano-CKM Model”, Journal of Quality, Vol. 12, No. 4, pp.  283-299 (TSSCI).
  34. D. Y. Sha, Cheng-Hsiang Liu, 2005, ”Using Data Mining for Due Date Assignment in a Dynamic Job Shop Environment”, The International Journal of Advanced Manufacturing Technology, Vol. 25, No. 11-12, pp. 1164-1174 (SCI).
  35. D. Y. Sha, Chao-Yang Liu, 2005, “Decision Making for Shop Floor Control Integration Strategies in Wafer Fabrication Using Tabu Search-Based Methodology”, International Journal of Manufacturing Technology and Management, Vol. 7, No. 1, pp. 83-103 (EI).
  36. D. Y. Sha, Z. H. Che, 2005.04, “Virtual Integration with a Multi-Criteria Partner Selection Model for the Multi-Echelon Manufacturing System”, The International Journal of Advanced Manufacturing Technology, Vol. 25, No. 7-8, pp. 793-802 (SCI).
  37. C. W, Chen, D. Y. Sha, 2005, “Heuristic approach for solving the multi-objective facility layout problem”, International Journal of Production Research, Vol. 43, No. 21, pp. 4493-4507 (SCI).
  38. D. Y. Sha, Z. H. Che, 2004.6, “A Multi-Criteria Analysis Approach for Capacitated Multi-Echelon Production-Distribution Network Modeling,” Journal of Management, Vol.21, No.3, pp.231-243, (TSSCI).
  39. S. Y. Hsu, D. Y. Sha, 2004.05, ”Due Date Assignment Using Artificial Neural Networks under Different Shop Floor Control Strategies”, International Journal of Production Research, Vol. 42, No. 9, pp.1727-1745 (SCI).
  40. D. Y. Sha, S. Y. Hsu, 2004, ”Due Date Assignment in Wafer Fabrication Using Artificial Neural Networks”, The International Journal of Advanced Manufacturing Technology, Vol.23, No.9-10, pp.768-775, (SCI).
  41. D. Y. Sha, Sheng-Yuan Hsu, 2004, ”The Effects of Rework on the Shop Floor Control in Wafer Fabrication”, Journal of Manufacturing Technology Management, Vol.15, No. 1, pp. 184-198, (EI).
  42. D. Y. Sha, Chao-Yang Liu, 2003, ”A Simulated Annealing Algorithm for Integration of Shop Floor Control Strategies in Semiconductor Wafer Fabrication”, The International Journal of Advanced Manufacturing Technology, Vol.22, pp.75-88, (SCI).
  43. Yung-Jye Sha (D. Y. Sha), Ling-Feng Hsieh, Shin-Hsing Lin, 2003.09, “Study on Wafer Rework Strategies and Dispatching Rules at the Photolithography Stage”, Journal of the Chinese Institute of Industrial Engineers, Vol. 20, No. 5, pp.457-464, (EI, TSSCI).
  44. D. Y. Sha, Richard Storch, Cheng-Hsiang Liu, 2003.08, “Predicting Due Dates under Various Combinations of Scheduling Rules in a Wafer Fabrication Factory”, Industrial Engineering & Management Systems, Vol. 2. No. 1, pp. 9-27.
  45. D. Y. Sha, Ling-Feng Hsieh, Kuan-Jen Chen, 2001.06, “Wafer Rework Strategies at the Photolithography Stage”, International Journal of Industrial Engineering – Theory, Applications and Practice, Vol.8, No.2, pp.122-130, (SCI, EI).
  46. D. Y. Sha, Chien-Wen Chen, 2001, “A New Approach to the Multiple Objective Facility Layout Problem”, Integrated Manufacturing Systems, Vol. 12, No.1, pp.59-66, (EI).
  47. C. W. Chen, and D. Y. Sha, 2001, “A Literature Review and Analysis to the Facility Layout Problem”, Journal of the Chinese Institute of Industrial Engineers, Vol.18, No. 1, pp.55-73, (in Chinese) (EI, TSSCI).
  48. D. Y. Sha, Ling-Feng Hsieh, 2000, “A Design of the Load Routing Problem in a Tandem AGV System”, Journal of the Chinese Institute of Industrial Engineers, Vol. 17, No. 1, pp. 103-110, (EI, TSSCI).
  49. C. W. Chen and D. Y. Sha, 1999, “A Design Approach to the Multi-Objective Facility Layout Problem,” International Journal of Production Research, Vol. 37, No. 5, pp.1175-1196, (SCI).
  50. Jun-Yao Huang and D. Y. Sha, 1998, “A Common Buffer-Based Approach to Buffer Management for a Wafer Fabrication Factory,” International Journal of Industrial Engineering- Theory, Applications and Practice, Vol. 5, No. 3, pp. 205-213, (SCI, EI).
  51. Jun-Yao Huang and D. Y. Sha, 1998, “Constructing Procedures of an Effective Production Activity Technique for a Wafer Fabrication Environment,” International Journal of Industrial Engineering - Theory, Applications and Practice, Vol. 5, No. 3, pp. 235-243, (SCI,EI).
  52. Ling-Feng Hsieh and D. Y. Sha, 1997, “Heuristic Algorithm for the Design of Facilities Layout and AGV Routes in Tandem AGV Systems,” International Journal of Industrial Engineering- Theory, Applications and Practice, Vol. 4, No.1, pp.52-61, ( SCI, EI).
  53. D. Y. Sha, and C. W. Chen, 1997, “Computer Aided Facility Layout: A Multiple Objective Approach”, Journal of the Chinese Institute of Industrial Engineers, Vol.14, No. 1, pp.39-47, (in Chinese) (EI, TSSCI).
  54. Ling-Feng Hsieh and D. Y. Sha, 1996.11, “A Design Process for Tandem Automated Guided Vehicle Systems,” Integrated Manufacturing Systems, Vol. 7No. 6pp. 30-38, (EI).
  55. D. Y. Sha, M. Shin, C. J. Liu, and L. F. Hsieh, 1995, “Heuristic Algorithm for the Concurrent Design of Manufacturing Layout and AGV Routes”, Journal of the Chinese Institute of Industrial Engineers, Vol.12, No. 2, pp.145-152, (in Chinese) (EI, TSSCI).
  56. D. Y. Sha, and K. C. Yu, B. C. Yuan, S. K. Liang, and C. H. Hwang, 1991, “Process-Oriented Software Development Productivity Model”, Technology Management Review, Vol.1, No. 1, pp.27-46, (in Chinese).
  57. D. Y. Sha, Y. J. Jan, 1987.06, “Mathematical Models for Increasing the Maximal Flow of a Capacitated Network,” Journal of the Chinese Institute of Industrial Engineers, Vol. 5, No. 1, pp. 57-63, (EI, TSSCI).
  58. D. Y. Sha, 1984.05, “An Algorithm for Finding the N Most Vital Links and Nodes in Weighted Networks,” Journal of Management Science, Vol. 1, No. 2, pp. 93-98 (TSSCI).
  59. D. Y. Sha, and D. C. Lin, 1983, “A Heuristic Algorithm for Order Picking Problem in Automatic Warehousing System with n S/R Machines”, Journal of the Chinese Institute of Industrial Engineers, Vol.3, No. 2, pp.17-24, (in Chinese) (EI, TSSCI).
  60. D. Y. Sha, 1983.12, “Finding the Single Most Vital Node in Weighted Networks,” Chiao Ta Management Review, Vol. 3, No. 2, pp. 61-70 (TSSCI).
  61. Chao-Ton Su, D. Y. Sha, Luan-Yuan Lu, 1983.12, “An Algorithm for Finding the Kth Minimax Path in a Weighted Network,” Chiao Ta Management Review, Vol. 3, No. 2, pp. 85-91 (TSSCI).
  62. H. W. Corley and D. Y. Sha, 1982.09, “Most Vital Links and Nodes in Weighted Networks,” Operations Research Letters, Vol. 1, No. 4, pp. 157-160, (SCI).