- D Y Sha, Sheng-Yuan Hsu, Hong-Yi Chen, 2016, “Creative Problem-solving QC Story based on Systematic Innovation TRIZ”, Journal of Quality, Vols. 23, No 1, pp. 25-41. (EI)
- D.Y.Sha, G.R.Liang, Kun-Chih Huang, 2013, “An Empirical Study on the Influencing Factors of Design Chain Integration”, Journal of Applied Sciences,13(10), pp. 1805-1810. (EI)
- D. Y. Sha, Der-Baau Perng, Guo-Liang Lai, 2013, “A Study of Using Smart Digital Content Technology in Retail Stores”, Applied Mechanics and Materials, Vols. 411-414, pp. 2161-2166.(EI)
- D. Y. Sha, Kun-Chih Huang, P.K.Chen, 2013, “The Influencing Factors of Customer Chain Integration - An Empirical Study”, Advances in Information Sciences and Service Sciences, Vol. 5, No. 4, pp. 371-378.(SCOPUS)
- D. Y. Sha, Guo-Hiang Lai, 2013.1, “Building an Innovative Digital Content Information System to Improve Service Quality of Retail Stores”, International Journal of Advancements in Computing Technology, Vol. 5, No. 2, pp. 819 ~ 827. (EI)
- D. Y. Sha, Guo-Liang Lai, 2012.12,
"Exploring the Intention to Use Innovative Digital Content Information Technology", Proceedings of the 2012 IEEE International Conference on Industrial Engineering and Engineering Management(IEEM 2012), pp. 1065 ~ 1069. (EI)
- D. Y. Sha, Kun-Chih Huang, P. K. Chen, 2012.3, "A Study on the Key Factors of Customer Chain Effectiveness", Lecture Notes in Engineering and Computer Science, v2, pp.1259-1262, International MultiConference of Engineers and Computer Scientists IMECS 2012. (EI)
- D. Y. Sha, Hsing-Hung Lin, 2011, “A New Particle Swarm Optimization for Multi-objective Open Shop Scheduling”, Journal of Information & Optimization Sciences, 32(6), 1269-1287. (EI)

- D. Y. Sha, Hsing-Hung Lin, 2010, “A multi-objective PSO for job-shop scheduling problems”, Expert System With Applications, Vol. 37, No. 2, pp. 1065-1070. (SCI, 2008 Impact Factor: 2.596)

- D. Y. Sha,
C. J. Yang, 2009, “The
transport strategies for fully-automated manufacturing in 300 mm water fab”, International Journal of Computer Integrated Manufacturing, Vol. 22, No. 10, pp. 962-975. (SCI)
- S. Y. Hsu, D. Y. Sha, Y.
H. Chang, 2009, “An Integrated Dispatching Rule with On-Line Rework Consideration in Wafer Fabrication”, Journal of Manufacturing
Technology Management, Vol. 20, No. 8, pp. 1166-1182. (EI)
- D. Y. Sha, Hsing-Hung Lin, 2009, “A
particle swarm optimization for multi-objective flow-shop scheduling”, International Journal of Advanced Manufacturing Technology,Vol. 45, No. 7, pp. 749-762. (SCI)

- D. Y. Sha, P. K. Chen, Y.
H. Chen, 2008, “Exploring the effects of advanced
manufacturing technology and e-commerce in the alignment of supply
coordination and competitiveness performance”, Journal of the
Chinese Institute of Industrial Engineers, Vol. 25, No. 5, pp. 399-412. (EI, TSSCI)

- D. Y. Sha, P. K. Chen,
2008, “Measuring the performance of different supply-chain integration
strategies”, Journal of Statistics and
Management Systems, Vol. 11, No. 4, pp. 721-748. (EI)
- D. Y. Sha, P. K. Chen,
2008, “The best scope of e-commerce diffusion in a supply-chain operational
environment: A global empirical study”, Journal
of Information and Optimization sciences, Vol. 29, No. 4, pp. 705-730.
(EI)

- D. Y. Sha, P. K. Chen, Y.
H. Chen, 2008, “The strategic fit of supply chain integration in the TFT-LCD
industry”, Supply Chain Management: An
International Journal, Vol. 13, No. 5, pp.
339-342. (SSCI)

- D. Y. Sha, C.-Y. Hsu, 2008,
“A new particle swarm optimization for the open shop scheduling problem,” Computers
& Operations Research Vol. 35, pp.3243-3261. (SCI).
- D. Y. Sha, J. T. Lin, C. J.
Yang, 2008, “The evaluation of search range assignment in
300mm automated material
handling system (AMHS),”International Journal of Advanced Manufacturing
Technology, Vol. 35, pp.697-710.(SCI).
- D. Y. Sha, H. S. Wang, Z.
H. Che, B. S. Teng ,
2007, “Constructing R&D Alliances in Product Development through System
Engineering,” International Journal of Electronic Business Management Vol. 5(1), pp. 59-69 (EI).
- D. Y. Sha, P. K. Chen, Yung-Hsin Chen, 2007.12, "Alignment
strategies of AMT and e-commerce setting to improve business strategy in the
supply chain operations environment-An empirical study", Proceedings of the 2007 IEEE International Conference on Industrial
Engineering and Engineering Management, pp. 1487-1491(Session
Chair) (EI)
- Z. H. Che, H. S. Wang, D.
Y. Sha, 2007, “A multi-criterion
interaction-oriented model with proportional rule for designing supply chain
networks,” Expert Systems with Applications, Vol. 33, Issue 4, pp.
1042-1053 (SCI).
- D. Y. Sha, S. Y. Hsu, X. D.
Lai, 2007.12, “Design of Due-Date Oriented Look-Ahead Batching Rule in Wafer
Fabrication”, International Journal of Advanced Manufacturing Technology,Vol.35,
No. 5-6, pp.596-609 (SCI).
- S. Y. Hsu, D. Y. Sha, 2007,
“The Integration of Shop Floor Control in Wafer Fabrication,” Journal of
Manufacturing Technology Management, Vol. 18, Issue 5, pp. 598-619 (EI).
- D. Y. Sha, Richard Lee Storch,
Cheng-Hsiang Liu, 2007, “Development of a Regression-based Method with
Case-based Tuning to Solve the Due Date Assignment Problem”, International
Journal of Production Research, Vol. 45, No. 1, pp. 65-82 (SCI).
- Chao-Ton Su, Yung-Hsin Chen, D. Y. Sha, 2007, “Managing Product and
Customer Knowledge in Innovative New Product Development”, International Journal of Technology Management, Vol. 39, Nos. 1/2, pp. 105-130 (SCI,
SSCI).
- D. Y. Sha, C.-Y. Hsu, 2006,
“A Hybrid Particle Swarm Optimization for Job Shop Scheduling Problem,” Computers
& Industrial Engineering, Vol. 51, No. 4, pp. 791-808 (SCI).
- Chi-Chang Liu, Yung-Hsin Chen and D.Y.Sha, 2006.11, “The TRIZ Application in
the Development of an Automotive Telematics Platform,” The TRIZ Journal (on-line publication).
- D. Y.Sha, Ping-Kuo Chen, Yung-Hsin Chen, 2006,
“Exploration of the Gap Problem between Planning and Execution in the Supply
Chain–A Case of Taiwan IC Industry,” Asian Journal of Management and Humanity Sciences ,Vol.
1, No.2. ,pp. 194-207
- D. Y. Sha, Cheng-Hsiang
Liu, 2006, “Development and Evaluation of a Tree-Indexing Approach to Improve
Case-Based Reasoning: Illustrated Using the Due Date Assignment Problem”, International Journal of Production Research, Vol. 44. No. 15, pp
3033-3049 (SCI).
- D. Y. Sha, S. Y. Hsu, Z. H. Che, C. H. Chen, 2006, “A Dispatching Rule for Photolithograpy Scheduling with An On-line Rework
Strategy”, Computers & Industrial Engineering, Vol. 50, pp.
233-247 (SCI).
- Chao-Ton Su, Yung-Hsin Chen, D. Y. Sha, 2006, “Linking Innovative Product
Development with Customer Knowledge: a Data-Mining Approach”, Technovation, Vol. 26, No. 7, pp. 784-795 (SSCI,
SCI, EI).
- D. Y. Sha, Z. H. Che, 2006, “Supply Chain Network Design: Partner
Selection and Production/ Distribution Planning Using a Systematic Model”, Journal
of the Operational Research Society, Vol. 57, No. 1, pp. 52-62 (SSCI,
SCI).
- Yung-Hsin Chen, D. Y. Sha, Chien-Hui Yang, 2005,
“Attractive Quality Creation via the Kano-CKM Model”, Journal of Quality,
Vol. 12, No. 4, pp. 283-299 (TSSCI).
- D. Y. Sha, Cheng-Hsiang
Liu, 2005, ”Using Data Mining for Due Date Assignment in a Dynamic Job Shop
Environment”, The International Journal of Advanced Manufacturing
Technology, Vol. 25, No. 11-12, pp. 1164-1174 (SCI).
- D. Y. Sha, Chao-Yang Liu,
2005, “Decision Making for Shop Floor Control Integration Strategies in Wafer
Fabrication Using Tabu Search-Based Methodology”, International Journal of Manufacturing Technology and Management, Vol. 7,
No. 1, pp. 83-103 (EI).
- D. Y. Sha, Z. H. Che, 2005.04, “Virtual Integration with a Multi-Criteria
Partner Selection Model for the Multi-Echelon Manufacturing System”, The
International Journal of Advanced Manufacturing Technology, Vol. 25, No.
7-8, pp. 793-802 (SCI).
- C. W, Chen, D. Y. Sha,
2005, “Heuristic approach for solving the multi-objective facility layout
problem”, International Journal of Production Research, Vol. 43, No.
21, pp. 4493-4507 (SCI).
- D. Y. Sha, Z. H. Che, 2004.6, “A Multi-Criteria Analysis Approach for
Capacitated Multi-Echelon Production-Distribution Network Modeling,” Journal
of Management, Vol.21, No.3, pp.231-243, (TSSCI).
- S. Y. Hsu, D. Y. Sha,
2004.05, ”Due Date Assignment Using Artificial Neural Networks under
Different Shop Floor Control Strategies”, International Journal of
Production Research, Vol. 42, No. 9, pp.1727-1745 (SCI).
- D. Y. Sha, S. Y. Hsu, 2004, ”Due Date Assignment in Wafer Fabrication Using
Artificial Neural Networks”, The International Journal of Advanced
Manufacturing Technology, Vol.23, No.9-10, pp.768-775, (SCI).
- D. Y. Sha, Sheng-Yuan Hsu, 2004, ”The
Effects of Rework on the Shop Floor Control in Wafer Fabrication”, Journal
of Manufacturing Technology Management, Vol.15, No. 1, pp. 184-198, (EI).
- D. Y. Sha, Chao-Yang Liu,
2003, ”A Simulated Annealing Algorithm for Integration of Shop Floor Control
Strategies in Semiconductor Wafer Fabrication”, The International Journal
of Advanced Manufacturing Technology, Vol.22, pp.75-88, (SCI).
- Yung-Jye Sha (D. Y. Sha), Ling-Feng Hsieh, Shin-Hsing Lin,
2003.09, “Study on Wafer Rework Strategies and Dispatching Rules at the
Photolithography Stage”, Journal of the Chinese Institute of Industrial
Engineers, Vol. 20, No. 5, pp.457-464, (EI, TSSCI).
- D. Y. Sha, Richard Storch, Cheng-Hsiang Liu, 2003.08, “Predicting Due Dates
under Various Combinations of Scheduling Rules in a Wafer Fabrication
Factory”, Industrial Engineering & Management Systems, Vol. 2. No.
1, pp. 9-27.
- D. Y. Sha, Ling-Feng Hsieh, Kuan-Jen Chen,
2001.06, “Wafer Rework Strategies at the Photolithography Stage”, International
Journal of Industrial Engineering – Theory, Applications and Practice,
Vol.8, No.2, pp.122-130, (SCI, EI).
- D. Y. Sha, Chien-Wen Chen, 2001, “A New Approach to the Multiple
Objective Facility Layout Problem”, Integrated Manufacturing Systems,
Vol. 12, No.1, pp.59-66, (EI).
- C. W. Chen, and D. Y. Sha,
2001, “A Literature Review and Analysis to the Facility Layout Problem”, Journal
of the Chinese Institute of Industrial Engineers, Vol.18, No. 1,
pp.55-73, (in Chinese) (EI, TSSCI).
- D. Y. Sha, Ling-Feng Hsieh, 2000, “A Design of the Load Routing Problem
in a Tandem AGV System”, Journal of the Chinese Institute of Industrial
Engineers, Vol. 17, No. 1, pp. 103-110, (EI, TSSCI).
- C. W. Chen and D. Y. Sha,
1999, “A Design Approach to the Multi-Objective Facility Layout Problem,” International
Journal of Production Research, Vol. 37, No. 5, pp.1175-1196, (SCI).
- Jun-Yao Huang and D. Y. Sha,
1998, “A Common Buffer-Based Approach to Buffer Management for a Wafer
Fabrication Factory,” International Journal of Industrial Engineering-
Theory, Applications and Practice, Vol. 5, No. 3, pp. 205-213, (SCI, EI).
- Jun-Yao Huang and D. Y. Sha,
1998, “Constructing Procedures of an Effective Production Activity Technique
for a Wafer Fabrication Environment,” International Journal of Industrial
Engineering - Theory, Applications and Practice, Vol. 5, No. 3, pp.
235-243, (SCI,EI).
- Ling-Feng Hsieh and D. Y. Sha, 1997, “Heuristic Algorithm for the Design of
Facilities Layout and AGV Routes in Tandem AGV Systems,” International
Journal of Industrial Engineering- Theory, Applications and Practice,
Vol. 4, No.1, pp.52-61, ( SCI, EI).
- D. Y. Sha, and C. W. Chen,
1997, “Computer Aided Facility Layout: A Multiple Objective Approach”, Journal
of the Chinese Institute of Industrial Engineers, Vol.14, No. 1,
pp.39-47, (in Chinese) (EI, TSSCI).
- Ling-Feng Hsieh and D. Y. Sha, 1996.11, “A Design Process for Tandem Automated
Guided Vehicle Systems,” Integrated Manufacturing Systems, Vol. 7,No. 6,pp. 30-38, (EI).
- D. Y. Sha, M. Shin, C. J.
Liu, and L. F. Hsieh, 1995, “Heuristic Algorithm for the Concurrent Design of
Manufacturing Layout and AGV Routes”, Journal of the Chinese Institute of
Industrial Engineers, Vol.12, No. 2, pp.145-152, (in Chinese) (EI,
TSSCI).
- D. Y. Sha, and K. C. Yu, B.
C. Yuan, S. K. Liang, and C. H. Hwang, 1991, “Process-Oriented Software
Development Productivity Model”, Technology Management Review, Vol.1,
No. 1, pp.27-46, (in Chinese).
- D. Y. Sha, Y. J. Jan,
1987.06, “Mathematical Models for Increasing the Maximal Flow of a
Capacitated Network,” Journal of the Chinese Institute of Industrial
Engineers, Vol. 5, No. 1, pp. 57-63, (EI, TSSCI).
- D. Y. Sha, 1984.05, “An
Algorithm for Finding the N Most Vital Links and Nodes in Weighted Networks,” Journal of Management Science, Vol. 1, No. 2, pp. 93-98 (TSSCI).
- D. Y. Sha, and D. C. Lin,
1983, “A Heuristic Algorithm for Order Picking Problem in Automatic
Warehousing System with n S/R Machines”, Journal of the Chinese Institute
of Industrial Engineers, Vol.3, No. 2, pp.17-24, (in Chinese) (EI,
TSSCI).
- D. Y. Sha, 1983.12,
“Finding the Single Most Vital Node in Weighted Networks,” Chiao Ta Management Review, Vol. 3, No. 2,
pp. 61-70 (TSSCI).
- Chao-Ton Su, D. Y. Sha,
Luan-Yuan Lu, 1983.12, “An Algorithm for Finding the Kth Minimax Path in a Weighted Network,” Chiao Ta Management Review, Vol. 3, No. 2,
pp. 85-91 (TSSCI).
- H. W. Corley and D. Y. Sha,
1982.09, “Most Vital Links and Nodes in Weighted Networks,” Operations
Research Letters, Vol. 1, No. 4, pp. 157-160, (SCI).
|